Land utilisation
Revised Masterplan and plot-level land information.
Development, land, actual utility consumption, energy requirements and infrastructure — consolidated in one technical information space.
Open the source systems and underlying spreadsheets directly. Google Sheets access follows existing Drive permissions.
Revised Masterplan and plot-level land information.
Monthly billed electricity consumption and current charges. Latest complete month: August 2026.
Monthly billed water consumption and current charges. Latest available month: July 2026.
Utility consumption reflects the billed MRANTI account portfolio, not a validated park-only meter baseline. See the data page for scope and coverage.
The Land Utilisation Dashboard is the primary view of the Revised Masterplan (2026) and plot-level land use.
Forward-looking requirements are not the same as metered consumption. Each figure is shown at the scope supported by the available evidence.
Working requirement, not measured electrical demand. Confirm the load basis, phasing and grid capacity before external use.
Four chillers. Typical weekday load 70–85%; 2024 electricity audit baseline 4.64 GWh. Do not extrapolate to park-wide demand.
No validated park-wide heating or steam load in the reviewed technical baseline.
Historical billed water usage is available; it cannot, by itself, establish future site-wide connection or peak capacity requirements.
Depends on actual offtake, tenant requirements and any assessed Cogen / CCHP scenario.
Validate future capacity against new development plots and tenant needs.
Invoiced consumption and current-period charges from the MRANTI billing records, with a directly accessible Power BI reporting view.
These figures cover MRANTI billed accounts and are not a validated MRANTI Innovation Park-only baseline. Electricity accounts may include other premises. Months refer to invoice/bill dates; actual meter-reading periods may cross calendar months. No raw bills, meter IDs, account numbers or arrears are published.
July is selected for a like-for-like electricity and water KPI comparison. Trend charts independently highlight the latest available month for each utility: August for electricity and July for water.
Explore the published dashboard for interactive reporting beyond the static aggregate snapshot.
For accurate interpretation during the GasMY technical discussion.
TNB Bill / Bill_Summary and SYABAS Water Bill Database / Bills, from the specified MRANTI Drive folder. Original files remain in Drive; no raw source tables are shipped.
Monthly usage sums the usage shown on unique account–invoice records. Current charges exclude previous balances; do not equate them with total payable or payment made.
Electricity has 51 billed accounts in each month from March to August. Water has three billed accounts in each month from March to July. Partial February and September data are excluded.
These are portfolio-level invoices, not park-specific peak electrical load, instantaneous water flow, or future infrastructure capacity.
Select a utility to review its current position and source documentation.
Source previews are requested from Google Drive and may require sign-in. Original Drive permissions remain in force. No utility bills are embedded here.
Technical assessment opportunities after the development, measured utility and infrastructure baselines are established.
Validate future load phasing, grid interface, redundancy and the potential role of distributed or gas-based generation.
Assess technical and commercial feasibility once electricity and thermal demand profiles are confirmed.
Test whether aggregated future cooling loads justify a centralised precinct or park-level solution.
Assess supply route, gas quality, certification and offtake requirements for future applications.